SRA — RISK ANALYSIS

Meridian Tower (sample) · n = 5,000

4 OPEN RISKS · 0 BAND OVERRIDES · 2 GROUPS · 10 ACTIVITIES
DISTRIBUTION · PERT · BASELINE ρ · 20% · LOADING…
Configure & run the Monte Carlo
Each iteration samples a duration for every activity and rolls every open risk. After a run, the result feeds the Sensitivity and Report tabs.
1 · Sampling
ITERATIONS
DEFAULT DISTRIBUTION
REPRODUCIBILITY
2 · Spread
OPTIMISTIC FALLBACK · −20%
PESSIMISTIC FALLBACK · +40%
3 · Run

Click Run to (re)compute the distribution. Results feed Sensitivity & Report.

P10 cost
near-best case
P50 cost
median
P80 cost
contingency target
P90 cost
high-confidence
Mean cost
μ
σ
std deviation
P10 finish
0d
P50 finish
0d
P80 finish
0d
P90 finish
0d
Mean dur
μ
σ days
std deviation

Schedule distribution

No simulation result yet

Configure the run above and click ▶ Run simulation.

Cost distribution

No simulation result yet

Click ▶ Run simulation above to populate this chart.